Hiking route
Takashima Trail
77.8 km· ↗ 5948 m
The trail is in Shiga Prefecture. A 77.8 km point-to-point route: the finish is not where you started. It runs from “Kunizakai Kogen” to “Kutsuki Kuwabara-bashi”. Total ascent is about 5948 m. Elevations along the way range from 268 to 972 m.
This description is assembled from OpenStreetMap data and our own terrain calculation.
Surface
- not recorded — 75 km (100%)
Surface data comes from OpenStreetMap tags on the route's ways.
Trail geometry and data come from OpenStreetMap (© OpenStreetMap contributors, ODbL). Check them on the ground: waymarking can go out of date.