Skip to content
CAMPLY
+ Spot
Hiking route

Takashima Trail

77.8 km· ↗ 5948 m

The trail is in Shiga Prefecture. A 77.8 km point-to-point route: the finish is not where you started. It runs from “Kunizakai Kogen” to “Kutsuki Kuwabara-bashi”. Total ascent is about 5948 m. Elevations along the way range from 268 to 972 m.

This description is assembled from OpenStreetMap data and our own terrain calculation.

Surface

  • not recorded — 75 km (100%)

Surface data comes from OpenStreetMap tags on the route's ways.

Trail geometry and data come from OpenStreetMap (© OpenStreetMap contributors, ODbL). Check them on the ground: waymarking can go out of date.